Daily Reports
Field reporting with AI-powered summaries and GPS-tagged photos
Reports Today
5
All submitted
Total SF Installed
6,840
+8% vs avg
Delays Reported
3
2 projects affected
Photos Uploaded
26
18 GPS tagged
Overall production across 5 active projects totaled 6,840 SF today, 8% above the weekly average. Meridian Tower and Riverside Campus are performing above targets. Grand Hyatt continues to face access issues with the GC — productivity is 30% below plan. Recommend escalating the elevator lobby access conflict to the owner's rep. Weather conditions were favorable across all sites. No safety incidents reported. 26 field photos were captured today with 18 GPS-tagged for location verification.
Meridian Tower - Levels 3-8
Porcelain Tile • Downtown Dallas, TX
Crew
18
Installed
1,420 SF
Weather
Clear 85°F
Photos
6
Delays
0
Notes:
Level 5 tile installation proceeding ahead of schedule. Grout work on Level 4 complete.
Legacy Medical Center
Epoxy Terrazzo • Plano, TX
Crew
14
Installed
680 SF
Weather
Clear 82°F
Photos
4
Delays
1
Delays:
• Material delivery delayed 2hrs
Notes:
Terrazzo grinding on Wing B. Waiting on epoxy resin delivery for Wing C.
Grand Hyatt Renovation
Ceramic Tile / Natural Stone • Austin, TX
Crew
20
Installed
890 SF
Weather
Partly Cloudy 79°F
Photos
8
Delays
2
Delays:
• GC schedule conflict - elevator lobby access denied
• Waterproofing incomplete in bathrooms
Notes:
Productivity impacted by access issues. Escalated to PM.
Riverside Corporate Campus
LVT / Carpet Tile • Fort Worth, TX
Crew
12
Installed
2,100 SF
Weather
Clear 84°F
Photos
3
Delays
0
Notes:
Building C carpet tile 90% complete. Starting LVT in corridors tomorrow.
Oakwood Elementary School
Epoxy Coating • Dallas, TX
Crew
8
Installed
1,750 SF
Weather
Clear 86°F
Photos
5
Delays
0
Notes:
Gym floor epoxy base coat applied. Cafeteria prep work complete.