Daily Reports

Field reporting with AI-powered summaries and GPS-tagged photos

Reports Today

5

All submitted

Total SF Installed

6,840

+8% vs avg

Delays Reported

3

2 projects affected

Photos Uploaded

26

18 GPS tagged

AIDaily Executive Summary

Overall production across 5 active projects totaled 6,840 SF today, 8% above the weekly average. Meridian Tower and Riverside Campus are performing above targets. Grand Hyatt continues to face access issues with the GC — productivity is 30% below plan. Recommend escalating the elevator lobby access conflict to the owner's rep. Weather conditions were favorable across all sites. No safety incidents reported. 26 field photos were captured today with 18 GPS-tagged for location verification.

Meridian Tower - Levels 3-8

Porcelain Tile • Downtown Dallas, TX

2026-05-09

Crew

18

Installed

1,420 SF

Weather

Clear 85°F

Photos

6

Delays

0

Notes:

Level 5 tile installation proceeding ahead of schedule. Grout work on Level 4 complete.

Legacy Medical Center

Epoxy Terrazzo • Plano, TX

2026-05-09

Crew

14

Installed

680 SF

Weather

Clear 82°F

Photos

4

Delays

1

Delays:

• Material delivery delayed 2hrs

Notes:

Terrazzo grinding on Wing B. Waiting on epoxy resin delivery for Wing C.

Grand Hyatt Renovation

Ceramic Tile / Natural Stone • Austin, TX

2026-05-09

Crew

20

Installed

890 SF

Weather

Partly Cloudy 79°F

Photos

8

Delays

2

Delays:

• GC schedule conflict - elevator lobby access denied

• Waterproofing incomplete in bathrooms

Notes:

Productivity impacted by access issues. Escalated to PM.

Riverside Corporate Campus

LVT / Carpet Tile • Fort Worth, TX

2026-05-09

Crew

12

Installed

2,100 SF

Weather

Clear 84°F

Photos

3

Delays

0

Notes:

Building C carpet tile 90% complete. Starting LVT in corridors tomorrow.

Oakwood Elementary School

Epoxy Coating • Dallas, TX

2026-05-09

Crew

8

Installed

1,750 SF

Weather

Clear 86°F

Photos

5

Delays

0

Notes:

Gym floor epoxy base coat applied. Cafeteria prep work complete.