AI Scheduling System
Auto-generated from Quick Bid estimates with live production feedback
Completed
0
of 11 tasks
In Progress
4
7 delayed
Overall Progress
62%
Health Score
73
out of 100
Avg Rate Variance
-34.0%
actual vs estimated
Critical Path
77d
3 tasks
2026-01-15 to 2026-06-17 • 153 calendar days
Based on production data analysis from 191 field entries
Schedule Delay Detected
7 tasks are behind schedule based on actual production rates. Consider adding crew or extending work hours to recover lost time. Average production is 34% below estimate — review crew composition and material staging.
Crew Flow Optimization
Schedule was auto-generated with 7-day staggered starts between bid areas to optimize crew flow. Critical path runs through Levels 3-5 - All Areas — prioritize this area for resource allocation.
Quick Bid Integration Active
This schedule was auto-generated from your Quick Bid estimate import (11 tasks from 7 bid areas). Production rates are based on RS Means data calibrated for your trade type. As field data accumulates, forecasts will become more accurate.