Time & Material

Change order tracking with digital GC signature approval

TOTAL TICKETS

5

1 drafts

PENDING SIGNATURE

1

$26,763.00

APPROVED VALUE

$20,171.58

3 tickets

THIS MONTH

$50,706.58

5 tickets

TM-2026-0047Approved

Meridian Tower - Levels 3-8

Additional tile demolition and re-installation in Level 4 elevator lobby due to GC waterproofing failure. Original waterproofing membrane failed inspection — required full tear-out and re-install of 320 SF porcelain tile.

Level 4 - Elevator LobbyMay 9, 2026

$7,360.00

3 labor • 4 material • 2 equip

Signed by Mike Patterson on May 9, 2026, 04:45 PM
TM-2026-0048Pending Signature

Grand Hyatt Renovation

Owner-directed change: upgrade from standard ceramic tile to natural stone in 6th floor VIP suite bathrooms. Includes removal of already-installed ceramic and full natural stone installation.

6th Floor - VIP Suite Bathrooms (3 rooms)May 8, 2026

$26,763.00

4 labor • 5 material • 3 equip

Awaiting signature from Tom Bradley (McCarthy Building Companies)
TM-2026-0049Approved

Meridian Tower - Levels 3-8

Emergency repair: plumber damaged 85 SF of completed tile on Level 3 corridor during pipe repair. GC directed immediate repair to maintain schedule.

Level 3 - East CorridorMay 7, 2026

$1,472.58

2 labor • 3 material • 1 equip

Signed by Mike Patterson on May 7, 2026, 03:20 PM
TM-2026-0050Invoiced

Legacy Medical Center

Additional terrazzo work in pharmacy area not included in original scope. Architect added 650 SF of epoxy terrazzo to match adjacent corridors.

Wing A - PharmacyMay 6, 2026

$11,339.00

2 labor • 5 material • 2 equip

Signed by Rick Morales on May 6, 2026, 02:30 PM
TM-2026-0051Draft

Grand Hyatt Renovation

Standby time: crew on-site but unable to work due to GC not completing drywall in ballroom pre-function area. 6 workers idle for full shift.

Ballroom Pre-Function AreaMay 10, 2026

$3,772.00

6 labor • 0 material • 0 equip